engineering accident造句
例句與造句
- 11 please write the “ drilling fluids engineering accident report ”
請(qǐng)?zhí)顚憽般@井液事故報(bào)告” 。 - Analysis and treatment of the engineering accident of a wheat storehouse
某小麥平房倉(cāng)工程事故的分析與處理 - Prevention and control measure of engineering accidents of bridge drilling - pore stake
橋梁鉆孔灌注樁工程事故的預(yù)防及處理措施 - Technical analysis of engineering accidents in development of mid coastal beaches of jiangsu province
江蘇沿海中部灘涂工程事故技術(shù)分析 - Having analysed and handled the engineering accident of embedded object in suzhou zi xing paper company . 4
3 .為蘇州紫興紙業(yè)公司分析與處理了聯(lián)合廠房預(yù)埋件事故。 - It's difficult to find engineering accident in a sentence. 用engineering accident造句挺難的
- So it is important to detect the pile ' s quality with effective means to avoid engineering accident
因此,采取有效的檢測(cè)手段對(duì)樁基進(jìn)行檢測(cè),避免工程事故的發(fā)生,是當(dāng)今工程界普遍關(guān)注的問(wèn)題。 - Many engineering accidents also indicate that it brooks no delay to carry out theoretical and experimental research systematically and thoroughly on this kind of structure
大量的工程事故也表明,對(duì)拱型波紋鋼屋蓋進(jìn)行深入系統(tǒng)的理論分析和試驗(yàn)研究已刻不容緩。 - It can effectively monitor the temperature change of electric equipment and warn in advance and in time so that engineering accident can be prevented . the experiment of linearity 、 sensibility 、 iteration and
通過(guò)性能測(cè)試試驗(yàn)對(duì)其傳感特性進(jìn)行了試驗(yàn)研究,試驗(yàn)結(jié)果表明傳感器具有高精度和良好的線性度、重復(fù)性。 - The paper makes the analysis of an engineering accident of the cracking of adjacent existing buildings caused by surface subsidence from groundwater lowering during the construction of large diameter dig - hole piles , finds out the cause , presents the treatment scheme and effectively guarantees the smooth conducting of the project
該文對(duì)由于大口徑人工挖孔樁施工降水引發(fā)地面沉降,造成鄰近建筑物開裂的工程環(huán)境事故進(jìn)行了分析,查明了原因,并提出了治理的方案,有效地保證了工程的順利進(jìn)行。 - Since the policy of reform and opening carried out in china , the special economic region , xiamen city has developed rapidly . more and more foundation trenches appear . but engineering accidents also follow because the supporting technique of foundation trenches is so complicated , fargoing and diverse
改革開放以來(lái),廈門市憑借良好的地理?xiàng)l件和政策扶持,經(jīng)濟(jì)發(fā)展十分迅速,深大基坑隨處可見,但是由于基坑圍護(hù)技術(shù)復(fù)雜,涉及范圍廣,變化因素多,事故頻繁,特別是由于廈門市獨(dú)特的地層條件,使得基坑支護(hù)成為建筑工程中最具有挑戰(zhàn)性的技術(shù)難點(diǎn)。 - Because of the merit of continuity , economical efficiency , reliability and high resolution , the well logging has shown its advantages , especially in some drilling engineering problem , such as the prediction of rock drillability , selecting the drill bit types , prediction of formation pressure , calculation the in - situ stress , evaluating the borehole walls stability and determining the reasonable mud density , and etc . aiming at the engineering accidents , for example the well spout , well leak , well collapse and the drill blocking during the drill engineering in the t formation in north - east of sichuan , some farther studies of formation pressure in feixianguan from well - logging information are presented in this dissertation
尤其是在巖石可鉆性預(yù)測(cè)與鉆頭選型、地層壓力預(yù)報(bào)、地應(yīng)力計(jì)算以及井壁穩(wěn)定性評(píng)價(jià)、泥漿密度安全窗確定等鉆井工程問(wèn)題上。測(cè)井技術(shù)由于連續(xù)性、經(jīng)濟(jì)性、可靠性及分辨率高等特點(diǎn),越來(lái)越多地顯示了其優(yōu)越性。本文針對(duì)川東北部三疊系地層在鉆井過(guò)程中遇到的井噴、井漏、井塌和卡鉆等工程事故,主要對(duì)飛仙關(guān)組地層壓力的測(cè)井解釋方法作了大量的深入研究工作。 - A huge actual constructions and tests has proved that the bonding power of the bonding surface is often too small to satisfy the actual stress , and that in the construction of the new to old concrete , the construction process is blind because there are no unified standards of the construction technology , which leads to the quality of the construction is inferior . and in the design process , the designers who can ’ t identify the strength of the bonding surface can not make an accurate , economic and proper design , which will lead to waste or engineering accident
大量的實(shí)際工程和試驗(yàn)證明,結(jié)合面的粘結(jié)力通常比較小,往往難以滿足實(shí)際結(jié)構(gòu)受力的需要,而且在新舊混凝土粘結(jié)的施工過(guò)程中,施工工藝沒有統(tǒng)一的標(biāo)準(zhǔn),造成施工過(guò)程的盲目性,最終導(dǎo)致工程質(zhì)量的低劣;在設(shè)計(jì)過(guò)程中設(shè)計(jì)人員不能判斷出粘結(jié)面的強(qiáng)度,這就使設(shè)計(jì)人員不能準(zhǔn)確、經(jīng)濟(jì)合理的做出設(shè)計(jì),造成浪費(fèi)或埋下工程事故的隱患。 - But compared with application of composite soil nail , theoretic study for composite soil nail is very laggard , so as to many engineering accidents , which brought biggish economic losses and harmful effect to society , happened because of incomplete design method , absent test study etc . therefore , study for work mechanism , design method and construction technology of composite soil nail is useful of technically perfection , and also useful of broadly application of this technology
然而,在對(duì)復(fù)合土釘支護(hù)技術(shù)的理論研究上卻相對(duì)落后,設(shè)計(jì)分析方法不完善,試驗(yàn)研究甚少,也因此發(fā)生了較多的基坑工程事故,造成了較大的經(jīng)濟(jì)損失和社會(huì)不良影響。因此,研究其工作機(jī)理、設(shè)計(jì)方法、以及施工技術(shù),將使得該項(xiàng)技術(shù)更加完善,也有利于該項(xiàng)技術(shù)應(yīng)用空間的擴(kuò)展。